This critical infrastructure initiative will rehabilitate approximately 20 miles of pipeline that runs along the Anacostia River, including:

The Anacostia Main Interceptor (AMI)

Approximately 5.1 miles of 30- to 66-inch pipes

The Anacostia Force Main (AFM)

33,000 linear feet of 108-inch PCCP

The East West Outfall Sewers (EWOS), East West Outfall Relief Sewers (EWORS), and North and South Interconnecting Branch Sewers (NIBS/SIBS)

Approximately 14 miles

Project Details

Washington, DC / Maryland
Budget: $431 Million
Duration: 2026-2035
Owner’s Engineer: Brown and Caldwell
Contract Type: Progressive Design Build (PDB)

Project Scope

Rehabilitation of approximately 20 miles of critical sewer infrastructure
Cleaning and condition assessment of existing interceptors
Flow diversion during construction
Installation of automatic Air Release Valves
Rehabilitation of RCP and concrete pipes
Cathodic protection system evaluation and restoration

Why Participate?

Local Job Creation – Opportunities for DC/Maryland-based businesses
Small Business Focus – Targeted work packages for various specialties
Long-Term Project – Multi-year engagement opportunities
Build Relationships – Connect with major industry partners
Community Impact – Be part of revitalizing critical infrastructure